Batterijopslagsysteem als een service – Cactos

Grid-scale battery storage from a single partner

Van commerciële locaties tot projecten op netniveau: de batterijopslagsystemen van Cactos maken slimmer energieverbruik overal mogelijk.

35 MWh

Installed grid-scale capacity

300+

Installed C&I sites

14.2 MWh

Largest installed system

Batteries, software and maintenance included

Whether you are planning to build a battery storage system on a green field site, add flexibility to renewable energy production, or implement a grid-scale battery system alongside large electricity consumption, Cactos is your partner.

We deliver a grid-scale battery storage system sized to your needs, without delays. We take care of delivery, installation, commissioning, operation and electricity market participation.

Hardware, software, commissioning and maintenance from a single partner

Manufactured in Finland at our factory in Kempele

Hoe Cactos je helpt

Fast and reliable solution delivery

Gebruik opgeslagen energie voor de behoeften van je pand en verlaag je kosten.

Verlaag je piekbelasting

Vlak je pieken in energieverbruik af en bespaar op transportkosten.

Possibility to lease your system

Krijg meer vermogen wanneer je het nodig hebt, zonder je netaansluiting te verzwaren.

Verdien door het net te ondersteunen

Neem automatisch deel aan de balanceringsmarkt om het elektriciteitsnet te stabiliseren.

Blijf operationeel bij stroomuitval

Onverwachte uitval? Geen probleem. Cactos dient als je vangnet en houdt je bedrijfsprocessen draaiende als het net wegvalt.

Haal alles uit je eigen energie

Sla zelf opgewekte energie op voor later of verkoop het op het meest rendabele moment.

Grid-scale battery energy storage

Nevado

A modular battery storage system

Nevado is a high-power, liquid-cooled battery energy storage system designed for grid-scale projects. It is built to operate reliably even in the most demanding conditions.

Three variants are available, starting from over 2 MW of power and over 4 MWh of capacity per unit. By combining multiple units, the system scales up to 50 MWh.

System capacity: 4–50 MWh

System power: 2–25 MW

Features and technical specifications

Features in grid scale projects Nevado 2.1 Nevado 3.3 Nevado 4.4
Fingrid ancillary service markets
Nord Pool intraday and day-ahead markets
Automatic market participation
24/7 monitoring and control
All maintenance and updates

Technical specifications

Specification Nevado 2.1 Nevado 3.3 Nevado 4.4
Battery capacity 4 180 kWh 6 688 kWh 9 196 kWh
Charging and discharging power 2,090 kVA 3,290 kVA 4,390 kVA
Battery modules LiFePo4 LiFePo4 LiFePo4
Cycle life 8,000 cycles, 70% SOH (25 °C) 8,000 cycles, 70% SOH (25 °C) 8,000 cycles, 70% SOH (25 °C)
Battery management system Cactos BMS Cactos BMS Cactos BMS
Dimensions H x W x D Batteries: 1,650 × 10,282 × 3,135 mm Batteries: 1,650 × 13,683 × 3,135 mm Batteries: 1,650 × 18,783 × 3,135 mm
Total weight Batteries: 42,500 kg Batteries: 68,000 kg Batteries: 93,500 kg

Completed projects

14.2 MWh battery storage system at NTRN Energy Park

Our customer Enetron acquired a 5.5 MW / 14.2 MWh battery storage system for their NTRN Energy Park 01 site in Kiiminki. The system consists of two Cactos Nevado units and participates in Fingrid's reserve markets as well as wholesale electricity markets.

Total system power: 5.5 MW

Participates in FCR-N, FCR-D, and aFRR reserve markets, and intraday and day-ahead wholesale markets.

10.3 MWh battery storage system in Kuhmoinen

We delivered a 10.3 MWh battery storage system to our customer Rando Grid in Kuhmoinen. The system automatically participates in both reserve markets and wholesale electricity markets, supporting grid stability and efficient energy use.

How to get started

  1. Assessment The project begins with an assessment of the site and grid connection possibilities, as well as the project goals.

  2. Permits Battery storage projects typically require at least a construction permit. The process depends on the municipality and local zoning.

  3. Delivery Cactos delivers, installs, and commissions the battery storage system.

  4. Operation Once the project is complete, the system participates in electricity markets. Cactos operates and maintains the battery storage system.

FAQ

Which markets does a Cactos battery storage system participate in?

In Finland, Cactos battery storage systems participate in Nord Pool intraday and day-ahead markets, Fingrid's reserve markets (FCR-N, FCR-D, aFRR).

What is the customer's responsibility in the project?

The customer is responsible for permitting, civil works and foundations, and the grid connection. For Nevado systems, the transformer and transformer substation are always included in Cactos' scope of delivery.